YB-40.5/0.8-6300 New Energy Box-type Substation (Hua Style)
The box transformer is divided into three parts: the high-voltage chamber, the low-voltage chamber, and the transformer itself, arranged in a "目" shape. Except for the transformer heat sink and the body that protrude outside the box, all other live compartments are sealed within independent chambers. Each chamber is isolated by partitions into independent sections, and there is a lower manhole in the box for easy installation and maintenance.
Outdoor Cabinet for Solar Energy Storage Microgrid
Commercial buildings and small industrial users: Manage electricity demand and save on electricity costs through peak and off-peak price differences. Rural villages without grid coverage: Independent power supply combined with wind or solar power generation to provide stable electricity. Hospitals, data centers, communication base stations: Emergency backup power for critical facilities to maintain the operation of essential equipment. Temporary power supply situations: Provide convenient mobile power solutions.
Outdoor Integrated Energy Storage Cabinet
Commercial buildings and small industrial users: Manage electricity demand and save on electricity costs through peak and off-peak price differences. Rural villages without grid coverage: Independent power supply combined with wind or solar power generation to provide stable electricity. Hospitals, data centers, communication base stations: Important facilities require emergency backup power to maintain the operation of critical equipment, necessitating temporary power supply solutions: Provide convenient mobile power solutions.
Danzhou Huaneng Smart Power Development Co., Ltd.
Hainan Danzhou 27MW Distributed Photovoltaic Power Generation Project
China Construction Eighth Engineering Bureau Co., Ltd.
Jinan Yaoqiang Airport Comprehensive Transportation Hub Project (Phase II)
China Construction Eighth Engineering Bureau Co., Ltd.
Hannan Yangtze River Bridge and Wiring Project of Loop Expressway in Wuhan Metropolitan Area
China Construction Seventh Engineering Bureau Co., Ltd.
Weisu high-speed railway to Qingdao connection line transformer installation project
China Construction Eighth Engineering Bureau Co., Ltd.
Distribution Project of Jinan Urban Rail Transit Line 7
China Construction Eighth Engineering Bureau Co., Ltd.
Third Bid Power Project of Hubei Section of Tongcheng-Xiu Shui Expressway
China Construction Third Engineering Bureau Co., Ltd.
Ji-Guang Expressway Jihe Section Reconstruction and Expansion Project Construction Third Bid Section Power Engineering
12th Bureau of Hydropower Construction of China
10kV Power Distribution Project in Ganggou Beautiful Village Pioneer Area, Licheng District, Jinan City
Feicheng City Agriculture and Rural Bureau
2023 Feicheng 32000 mu high standard farmland construction project
Agricultural and Rural Bureau of Dongchangfu District, Liaocheng City
2024 Dongchangfu District 15000 Mu High Standard Farmland Construction Project
Related Charging Pile Products
The energy service of the charging station and the core hardware equipment have achieved excellence.
7kW AC Charging Station - Standalone Version (Wall-Mounted/Pole-Mounted)
This product can be installed in wall-mounted or column-mounted ways, making it easy to construct and install securely. It is made using a one-piece stamping process with PC material, featuring a high aesthetic appeal and a high protection level. It is simple to operate and has a wide range of application scenarios, making it an efficient and safe charging device that provides AC power for automotive onboard chargers.